    • BRRABillB
      BRRABill @BRRABill
      last edited by

      @BRRABill said:

      What is the advantage of "2 distinct output groups"?

      Is it bad manners to quote oneself? LOL.

      Or not advantage, but reasoning why it would be used?

      1 Reply Last reply Reply Quote 0
      • JaredBuschJ
        JaredBusch
        last edited by

        1. For monitoring distinctly. Very useful if you have different devices plugged in to know their power levels explicitly.
        BRRABillB 1 Reply Last reply Reply Quote 0
        • BRRABillB
          BRRABill @JaredBusch
          last edited by

          @JaredBusch said:

          1. For monitoring distinctly. Very useful if you have different devices plugged in to know their power levels explicitly.

          I researched this a bit on their site. Pretty cool.

          Monitors on one side, shutting down sooner.

          Interesting concept.

          1 Reply Last reply Reply Quote 0
          • BRRABillB
            BRRABill @scottalanmiller
            last edited by

            @scottalanmiller said:

            The recommended design is two UPS, one for each rail. Each PSU goes into one rail, each rail into one UPS each UPS into as separate circuits as you can get.

            What do you mean by "rail" here?

            JaredBuschJ 1 Reply Last reply Reply Quote 0
            • JaredBuschJ
              JaredBusch @BRRABill
              last edited by

              @BRRABill said:

              @scottalanmiller said:

              The recommended design is two UPS, one for each rail. Each PSU goes into one rail, each rail into one UPS each UPS into as separate circuits as you can get.

              What do you mean by "rail" here?

              In this sense, rail means the left or right rear post of the server rack. A lot of server racks have a power bar going up and down the rails.

              BRRABillB 2 Replies Last reply Reply Quote 0
              • BRRABillB
                BRRABill @JaredBusch
                last edited by

                @JaredBusch said:

                In this sense, rail means the left or right rear post of the server rack. A lot of server racks have a power bar going up and down the rails.

                Thanks.

                We are all tower servers here.

                The only rack we have here is an equipment rack.

                Man, I need a road trip to some of the places you guys work. 🙂

                JaredBuschJ MattSpellerM 2 Replies Last reply Reply Quote 0
                • BRRABillB
                  BRRABill @JaredBusch
                  last edited by

                  @JaredBusch said:

                  In this sense, rail means the left or right rear post of the server rack. A lot of server racks have a power bar going up and down the rails.

                  So, multiple servers could be plugged into each rail?

                  So @scottalanmiller is saying the recommended solution is to plug all server into one side of the rack (rail), and then that rail itself into a UPS?

                  That would seem hard to calculate the proper wattage unless the rack was full.

                  JaredBuschJ 1 Reply Last reply Reply Quote 0
                  • JaredBuschJ
                    JaredBusch @BRRABill
                    last edited by

                    @BRRABill said:

                    @JaredBusch said:

                    In this sense, rail means the left or right rear post of the server rack. A lot of server racks have a power bar going up and down the rails.

                    Thanks.

                    We are all tower servers here.

                    The only rack we have here is an equipment rack.

                    Man, I need a road trip to some of the places you guys work. 🙂

                    Most SMB do not have them. It is a term from Enterprise and colocation datacenters.

                    Since you have 2 power supplies in your servers, you plug PS1 into the left rial and PS2 into the right rail on all your hardware.
                    You plug the left rail into one UPS and the right rail into a different UPS. Then each UPS is also plugged into a different circuit.

                    1 Reply Last reply Reply Quote 0
                    • JaredBuschJ
                      JaredBusch @BRRABill
                      last edited by

                      @BRRABill said:

                      @JaredBusch said:

                      In this sense, rail means the left or right rear post of the server rack. A lot of server racks have a power bar going up and down the rails.

                      So, multiple servers could be plugged into each rail?

                      So @scottalanmiller is saying the recommended solution is to plug all server into one side of the rack (rail), and then that rail itself into a UPS?

                      That would seem hard to calculate the proper wattage unless the rack was full.

                      Why would it be hard? You know that you plugged in 4 servers into each rail. Each PS is 500W. So each rail has 2kW.

                      BRRABillB 1 Reply Last reply Reply Quote 0
                      • MattSpellerM
                        MattSpeller @BRRABill
                        last edited by

                        @BRRABill said:

                        Man, I need a road trip to some of the places you guys work. 🙂

                        You and me both, I think it'd be an eye opening experience for everyone

                        BRRABillB 1 Reply Last reply Reply Quote 0
                        • BRRABillB
                          BRRABill @JaredBusch
                          last edited by

                          @JaredBusch said:

                          Why would it be hard? You know that you plugged in 4 servers into each rail. Each PS is 500W. So each rail has 2kW.

                          Do you always have each rack pre-filled with servers?

                          I was thinking where you had 1 server or 2 in a rack. Do you buy capacity for now, or when the rack is filled?

                          MattSpellerM 1 Reply Last reply Reply Quote 0
                          • BRRABillB
                            BRRABill @MattSpeller
                            last edited by

                            @MattSpeller said:

                            You and me both, I think it'd be an eye opening experience for everyone

                            I'm lucky that my wife (also in IT) has always worked in larger environments. So I get to see a lot of "the other side" in my little SOHO world.

                            1 Reply Last reply Reply Quote 0
                            • JaredBuschJ
                              JaredBusch
                              last edited by

                              @BRRABill said:

                              @JaredBusch said:

                              Why would it be hard? You know that you plugged in 4 servers into each rail. Each PS is 500W. So each rail has 2kW.

                              Do you always have each rack pre-filled with servers?

                              I was thinking where you had 1 server or 2 in a rack. Do you buy capacity for now, or when the rack is filled?

                              You plan your capacity on what you have or realistically expect to get in the near term. always. You don't plan for some unknown future amount of servers.

                              BRRABillB 1 Reply Last reply Reply Quote 0
                              • MattSpellerM
                                MattSpeller @BRRABill
                                last edited by

                                @BRRABill said:

                                @JaredBusch said:

                                Why would it be hard? You know that you plugged in 4 servers into each rail. Each PS is 500W. So each rail has 2kW.

                                Do you always have each rack pre-filled with servers?

                                I was thinking where you had 1 server or 2 in a rack. Do you buy capacity for now, or when the rack is filled?

                                For UPS it's best to talk to the business and see what their plans are. You know you need batteries for the things every 3 years and that's a good time to swap out if you need bigger (bigger being the only real reason to change UPS).

                                JaredBuschJ 1 Reply Last reply Reply Quote 0
                                • BRRABillB
                                  BRRABill @JaredBusch
                                  last edited by

                                  @JaredBusch said:

                                  You plan your capacity on what you have or realistically expect to get in the near term. always. You don't plan for some unknown future amount of servers.

                                  I guess I was thinking the Enterprise folk were always welcoming new servers into the fold.

                                  😃

                                  MattSpellerM 1 Reply Last reply Reply Quote 0
                                  • JaredBuschJ
                                    JaredBusch @MattSpeller
                                    last edited by

                                    @MattSpeller said:

                                    @BRRABill said:

                                    @JaredBusch said:

                                    Why would it be hard? You know that you plugged in 4 servers into each rail. Each PS is 500W. So each rail has 2kW.

                                    Do you always have each rack pre-filled with servers?

                                    I was thinking where you had 1 server or 2 in a rack. Do you buy capacity for now, or when the rack is filled?

                                    For UPS it's best to talk to the business and see what their plans are. You know you need batteries for the things every 3 years and that's a good time to swap out if you need bigger (bigger being the only real reason to change UPS).

                                    Not just for UPS. this is always best advice. you never buy things for future. You buy for what you need and a realistic expectation of growth.

                                    1 Reply Last reply Reply Quote 1
                                    • MattSpellerM
                                      MattSpeller @BRRABill
                                      last edited by

                                      @BRRABill said:

                                      @JaredBusch said:

                                      You plan your capacity on what you have or realistically expect to get in the near term. always. You don't plan for some unknown future amount of servers.

                                      I guess I was thinking the Enterprise folk were always welcoming new servers into the fold.

                                      😃

                                      I want to live in this fairy tale land of new equipment too lol we poor sods in small / charity environments get everyone else's used gubbins.

                                      BRRABillB 1 Reply Last reply Reply Quote 0
                                      • BRRABillB
                                        BRRABill @MattSpeller
                                        last edited by

                                        @MattSpeller said:

                                        I want to live in this fairy tale land of new equipment too lol we poor sods in small / charity environments get everyone else's used gubbins.

                                        I bet my servers are older than yours! 😉

                                        scottalanmillerS 1 Reply Last reply Reply Quote 1
                                        • scottalanmillerS
                                          scottalanmiller @BRRABill
                                          last edited by

                                          @BRRABill at one point we had nearly all ten year old servers 🙂

                                          dafyreD 1 Reply Last reply Reply Quote 0
                                          • dafyreD
                                            dafyre @scottalanmiller
                                            last edited by

                                            @scottalanmiller said:

                                            @BRRABill at one point we had nearly all ten year old servers 🙂

                                            @scottalanmiller can still probably top this... But when I was at my last job we finally retired a server that had been in operation for 30 years.

                                            1 Reply Last reply Reply Quote 0