EATON AMA
-
@BRRABill said:
@art_of_shred said:
Coffee break @ Eaton offices?
I'm more curious as to how they are as a group handling questions. Huddled in a conference room?
"Who is this Jared guy, and how much should we tell him?"
-
-
@ciwoodhouse said:
@BRRABill Here's the gist:
β’ You can purchase up to three times the VA you are trading in! The new Eaton unit can be a smaller VA rating than the old UPS too.
β’ Your discount is for the purchase of the new Eaton UPS only and not the old UPS traded in
β’ Return shipping labels will be provided to you to send the old UPS(s) back for disposal β free of chargeIt is a set discount amount, like 10% or whatever?
For me, a lot of the allure of that program is just getting rid of the old UPSes in an environmentally friendly way.
-
@dafyre said:
@art_of_shred said:
@JColeKen said:
@JaredBusch Around $3,500-$4,000, not including the automatic transfer switch.
For 11kW?? Wow. I would have expected a bit more for that.
Maybe installation is an extra $7,723.69 ?
kW not K.
-
@JColeKen said:
@JaredBusch Around $3,500-$4,000, not including the automatic transfer switch.
Oh... man that is inexpensive... might need to look at that in the near future. I've learned so much from this AMA.
-
@dafyre Our offering is a liquid propane or natural gas generator, so no diesel. The electrical wiring, installation, and the ATS would be additional costs.
-
Explain it like I am 5. How do you correctly calculate the power usage of a 3-phase PDU? I have been wrestling with this and would really love a simple calculator or spreadsheet or something.
-
@art_of_shred I think everyone just left the techy questions to @JColeKen to fend for himself Don't eat him alive!
-
I recently started a discussion here on ML about why UPS companies like to always recommend "server-grade" UPS for servers, even though they might not really need it.
What is your feeling on this, and is there any times you think a desktop level UPS might be OK for some server applications? (As the included thread seems to lean in that direction.)
http://mangolassi.it/topic/6865/server-ups-recommendations/2
-
@coliver said:
@JColeKen said:
@JaredBusch Around $3,500-$4,000, not including the automatic transfer switch.
Oh... man that is inexpensive... might need to look at that in the near future. I've learned so much from this AMA.
Yeah, the wheels are turning in my head, now. Hmm....
-
@Nic One of the things Eaton is most excited about is CI and hyper CI...we've made a lot of headway with others in the industry to try to make lives of IT pros easier and make their solutions more reliable. http://powerquality.eaton.com/About-Us/Alliances/default.asp
-
@molly said:
@art_of_shred I think everyone just left the techy questions to @JColeKen to fend for himself Don't eat him alive!
You can feel free to answer my line conditioner question...
-
@art_of_shred If I felt I adequately could, I would! I have come to terms that I'm no IT pro.
-
@BRRABill We tested that theory on a different forum with a user base. We provided an βoff-lineβ UPS in their typical environments. Communications is really what makes a UPS βserver gradeβ. So if being able to remotely shutdown (or with integration of a hypervisor) migrate VMβs to a safe host (a server that is not on battery), which is usually the case, we would recommend sticking with something that talks to you and lets you take actions or have those actions preemptively ready to go.
-
@molly It's really an electrician's question. I'm just curious if anyone has an informed answer for it.
-
@BRRABill There are a few things that go into it. One is the level of protection...that is typically the most important. Others included extended battery capability and network capability (many more, just naming a few). In some cases you may only require a certain level of protection and limited communication/extended run capability, so in those cases you'd be fine running a lower end UPS (less feature rich). But in general,we try to make it easy for someone off the street that knows nothing about UPS to be able to purchase protection for their "servers" and make sure that offering will provide them everything they would be required.
-
@gbeyhaut said:
@JaredBusch prices on the web!! NEVER! www.cdw.com should have some prices. To be honest we sell these primarily through electrical distributors like Wesco and Rexel.
Even so, I think Jared is correct and getting MSRP prices or some guidance on pricing without needing to go to random online resellers. This presents a huge barrier to research and puts off IT departments. It works for IT that is being driven by their resellers, but not IT doing their own IT work.
-
@scottalanmiller completely agree!
-
Two easy ways, one hard way.
Easy
-
Add all your IT load wattages together. Done
-
For 120V loads, add all your currents per each "segment" and multiply them all by 120V. If you have three phases, the process is the same: take all the currents, add together, multiply by 120V. Done!
-
For 208V loads, avoid the physics lessons. Take the current on each "segment" and multiply by 208V * SQRT(3). Done!
For those math nerds out there SQRT of three is based off of 120deg phase angle from your unit circle. OK. There are great resources out there on three phase power, but don't make it too complicated. The above equations can get you there.
-
-
@JColeKen Yea, I kinda figured that. My family is chock full of Electricians... all I need is somebody to wire it up to my house's gas line and I'm golden, lol.