ML
    • Recent
    • Categories
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Virtualization Build - Punch holes in this build please

    IT Discussion
    11
    51
    9.2k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • DustinB3403D
      DustinB3403 @dafyre
      last edited by

      @dafyre yes.

      1 Reply Last reply Reply Quote 0
      • DashrenderD
        Dashrender @MattSpeller
        last edited by

        @MattSpeller said:

        @dafyre said:

        @MattSpeller said:

        @anonymous said:

        @DustinB3403

        Dell Warranty & Onsite Service (Exclusive Offer) (3 Year Dell ProSupport 4HR 7x24 Onsite: Non Mission Critical)
        Server no drives
        ($10,156+/Each)

        Why do you need such a costly warranty? Isn't the point of having 2 hosts that you only need 1 running at a given time?

        I think that's got some confusing numbers in it, my math says that $10k is about what the server would run without SSD

        This 10K price tag is for the Servers AND the 3 year Warranty, right?

        Must be because that's waaaaaaaaaaay too much for a warranty.

        unless the hardware is free? lol

        1 Reply Last reply Reply Quote 0
        • DashrenderD
          Dashrender
          last edited by

          Ouch a 20% increase.

          I have to agree with the ask.. .do you need 24 cores? Would 12 be enough?

          scottalanmillerS 1 Reply Last reply Reply Quote 0
          • scottalanmillerS
            scottalanmiller @DustinB3403
            last edited by

            @DustinB3403 said:

            The same thing could be said for what if the server dies, that I should diversify my server fleet.

            That's not how it is handled in the real world. Even the most demanding environments use matched hardware. You don't avoid buying two of the same car model to diversify hardware, right? Issues are either obvious or don't affect you simultaneously. Going to a different vendor randomizes in such a way that it puts you in more risk rather than less.

            1 Reply Last reply Reply Quote 0
            • scottalanmillerS
              scottalanmiller @DustinB3403
              last edited by

              @DustinB3403 said:

              To avoid issues such as firmware bugs etc.

              Better to just stagger installs. That's what big firms with very critical workloads do.

              1 Reply Last reply Reply Quote 0
              • scottalanmillerS
                scottalanmiller @DustinB3403
                last edited by

                @DustinB3403 said:

                Warranties are to protect the equipment and of course the warranty could be reduced for the second system.

                But its the warranty to protect the equipment for the usable life.

                His question is... why pay for such a fast response when you have a failover system to keep you running?

                If Dell can get you repaired in just over four hours, what justifies the cost of the second physical server and all of the Windows licensing necessary to use it when you will be back up shortly?

                Why four hour and not next business day, for example?

                1 Reply Last reply Reply Quote 0
                • scottalanmillerS
                  scottalanmiller @Dashrender
                  last edited by

                  @Dashrender said:

                  Ouch a 20% increase.

                  I have to agree with the ask.. .do you need 24 cores? Would 12 be enough?

                  Or six?

                  Generally SMBs need only for to six cores on Intel Xeons and even that is often hardly utilized.

                  1 Reply Last reply Reply Quote 0
                  • scottalanmillerS
                    scottalanmiller
                    last edited by

                    That price bump makes looking at other solution types that much more attractive, that is a lot of the buffer room removed.

                    JaredBuschJ 1 Reply Last reply Reply Quote 0
                    • JaredBuschJ
                      JaredBusch @scottalanmiller
                      last edited by

                      @scottalanmiller said:

                      That price bump makes looking at other solution types that much more attractive, that is a lot of the buffer room removed.

                      Yeah, at $36k for the hardware, you can pretty much get 2 scale units one for on site and one for off.

                      DashrenderD 1 Reply Last reply Reply Quote 1
                      • DashrenderD
                        Dashrender @JaredBusch
                        last edited by

                        @JaredBusch said:

                        @scottalanmiller said:

                        That price bump makes looking at other solution types that much more attractive, that is a lot of the buffer room removed.

                        Yeah, at $36k for the hardware, you can pretty much get 2 scale units one for on site and one for off.

                        LOL you missed a comma - at first glance it appears that you are suggesting he can get three Scale units 😉

                        JaredBuschJ 1 Reply Last reply Reply Quote 0
                        • JaredBuschJ
                          JaredBusch @Dashrender
                          last edited by

                          @Dashrender said:

                          @JaredBusch said:

                          @scottalanmiller said:

                          That price bump makes looking at other solution types that much more attractive, that is a lot of the buffer room removed.

                          Yeah, at $36k for the hardware, you can pretty much get 2 scale units one for on site and one for off.

                          LOL you missed a comma - at first glance it appears that you are suggesting he can get three Scale units 😉

                          Oops

                          1 Reply Last reply Reply Quote 0
                          • scottalanmillerS
                            scottalanmiller
                            last edited by

                            What is the latest on this one?

                            1 Reply Last reply Reply Quote 0
                            • DustinB3403D
                              DustinB3403
                              last edited by

                              Gonna end up ordering today I believe. Just gotta get a hold of @BradfromxByte

                              1 Reply Last reply Reply Quote 2
                              • scottalanmillerS
                                scottalanmiller
                                last edited by

                                Wow, good timing then 🙂

                                1 Reply Last reply Reply Quote 0
                                • scottalanmillerS
                                  scottalanmiller
                                  last edited by

                                  Last check in you thought that you were just about to order it, but that was two months ago. Any follow up since then?

                                  DustinB3403D 1 Reply Last reply Reply Quote 0
                                  • DustinB3403D
                                    DustinB3403 @scottalanmiller
                                    last edited by

                                    @scottalanmiller These were ordered and installed ~2 weeks ago.

                                    I posted about it here.

                                    1 Reply Last reply Reply Quote 2
                                    • 1
                                    • 2
                                    • 3
                                    • 3 / 3
                                    • First post
                                      Last post